by Aidan Muir | Jan 3, 2023
L’Avenir: Living Building Challenge Fort Collins 28 kW Commercial Sandbox Solar had the opportunity to work on the amazing L’avenir Living Building Challenge, a project providing solar-powered living in Fort Collins. This project was designed and...
by Aidan Muir | Nov 14, 2022
Summit Plant Labs Fort Collins 15 kW Agrivoltaics Summit Plant Labs is a local farm that strives to be completely carbon neutral. To reach this goal, a large solar system was needed to generate sufficient power. However, Summit Plant Labs did not have enough land to...